Coles - Hot water Energy Management

Alectrite was involved in the manufacture and installation of the hot water element control boards. These control boards were installed to electronically control the heating elements in there hot water systems. These are proven energy managment devices through out there estate. 

Collins Logistic centre - project under construction

We are currently wiring  the 5 five logistic size cool rooms at collins transport Eastern Creek Sydney. For this project we manufactured and installed 5 tier MSB for the 10000 sqm dual temp cool rooms. We have also installed the Mechanical electrical for the HVAC 

Woolworths - HVAC

Recommissioning and installation of VSD’s onto Heating Ventilation and Airconditioning (HVAC) were carried out in Woolworths and Coles Supermarkets in 2015 for the energy management purpose. In this project we installed VSD onto the AHU, and a new E2 Control System was added for further efficiency. Alectrite was involved in all process of the project for building the cabinet to final install and commissioning. This was completed in 30 Coles sites and 18 Woolworths sites across NSW.